Connecting frontline risk
to the board
Bowtie analysis, ISO 31000 risk methodology, and AI‑powered insights. Built for any team that manages real operational risk — not just compliance checkboxes.
The problem
Risk management is broken
A $13 billion market, and most teams are still choosing between spreadsheets, checkbox compliance tools, or enterprise platforms that cost more than the risks they manage.
Spreadsheets don't scale
Your risk register is in Excel. Controls live in a shared drive. Incidents go to email. When the regulator asks for your control effectiveness, you spend a week copy-pasting.
Compliance tools don't manage risk
SOC 2 gets you a certificate. ISO 27001 gets you an audit report. Neither tells you which critical risks have degraded barriers or overdue corrective actions. Compliance is not risk management.
Enterprise GRC is $100K+ and 6 months
Custom quotes, year-long implementations, armies of consultants. By the time Archer or ServiceNow is configured, your risk profile has changed three times.
Platform
Everything connected.
Nothing siloed.
Risks, controls, incidents, actions, assessments, and bowties — all linked in a single integrated workflow. When a control degrades, you see the impact instantly.
Risk Registers
ISO 31000 aligned
Multi-level risk registers with inherent and residual scoring, risk appetite thresholds, and automatic breach alerts. Every risk linked to its controls, incidents, and actions.
Bowtie Analysis
Visual risk barriers
Interactive bowtie diagrams connecting threats through preventive and mitigative barriers to consequences. See barrier degradation and control effectiveness at a glance.
Incident Investigation
ICAM, Five Whys, PEEPO
Structured investigation templates with timeline reconstruction, contributing factor analysis, and corrective action tracking. Link findings directly to risk controls.
Assessment Templates
HAZOP, HAZID, FMEA, SWIFT
Run structured risk assessments using industry-standard methodologies. Pre-built templates with guided wizards, or create your own. Full session history and audit trail.
AI Risk Intelligence
Powered by GPT-4
AI-suggested risk scores based on control effectiveness. Similar risk detection across registers. Automatic control gap analysis and risk description generation.
Control Testing
Scheduled compliance
Schedule recurring control tests with reminders and escalation. Track effectiveness over time. Coverage maps showing which risks have strong controls and which have gaps.
See it in action
Built by people who understand
operational risk
Every screen is designed for safety professionals, risk managers, and site teams — not IT auditors or compliance officers.
Your risks at a glance
Risk heat maps, severity breakdowns, and direct links to controls and actions. Everything you need to understand your risk profile in one view.
Try it free
Framework
Integrated risk management.
Built around critical risks.
Most tools give you disconnected modules. RiskSight connects every part of your risk management framework into a single, continuous workflow, with your critical risks at the centre.
Risks The centre of
everything
Risk Registers
Identify, score, and prioritise. Escalate critical risks for deeper analysis.
Bowtie Analysis
Map threats, barriers, and consequences for every critical risk.
Control Assurance
Verify controls work. Track effectiveness. Get alerts on degradation.
Incident Investigation
Investigate incidents. Link findings to the controls and risks that failed.
How the framework works
Identify Critical Risks
Start with what matters most. Identify your material unwanted events and critical risks using structured methodologies. Link each risk to real-world consequences.
Map Controls & Barriers
For every critical risk, map the preventive and mitigative controls using bowtie analysis. See every barrier between the hazard and the consequence.
Verify & Assure
Schedule control verification activities. Track effectiveness over time. When a barrier degrades, the system alerts you before the risk profile changes.
Investigate & Learn
When incidents occur, investigate using ICAM or structured methods. Link findings back to the controls and risks that failed. Close the loop.
Critical risk visualisation
Bowtie analysis that teams
actually use
At the heart of every critical risk is a bowtie. Visualise threats through preventive and mitigative barriers to consequences. Track barrier effectiveness and link directly to your control register and assurance activities.
Built for high-hazard
Where risk is real,
not theoretical
RiskSight is designed for industries where a failed control doesn't mean a compliance gap — it means someone could get hurt.
Mining
Underground and surface operations, critical risk management, ground control hazards
Construction
High-rise, civil, infrastructure — managing safety across distributed sites
Energy & Utilities
Power generation, transmission, oil & gas — critical infrastructure protection
Manufacturing
Process safety, chemical handling, equipment failure analysis
The risk assessment template
we build with practitioners
A workshop-ready Excel workbook — structured scope, a WRAC-style register, a calibrated 5×5 matrix, and a control versus critical control guide. Aligned to ISO 31000 and the ICMM approach.
Free · Excel format · No credit card
Pricing
Transparent pricing.
No surprises.
While other vendors hide behind "contact sales", we publish our prices. Starter, Professional and Enterprise plans include unlimited field users, unlimited sites, and a 30-day free trial.
⚡ Power Users
Create, edit, and manage. Risk registers, bowtie diagrams, assessments, investigations, approvals, and reports. For safety teams, engineers, investigators, and managers.
👷 Field Users
Report and observe. Log hazards, submit observations, complete inspections, and report incidents from any device. Unlimited on Starter, Professional and Enterprise.
Entry
For small teams and contractors getting started with structured operational risk.
monthly billing — no annual lock-in
- 3 power user seats
- 50 field users
- Bowtie diagrams & risk registers
- All assessment templates (HAZOP, HAZID, FMEA, SWIFT, WRAC)
- Incident reporting & investigation
- Hazard reporting
- Action tracking & close-out
- Lessons learned register
- QR code field reporting
- Email & in-app notifications
- Risk matrix & dashboards
- CSV & PDF export
- Custom roles and permissions
- Australian data residency
- Community support
Starter
For growing teams running a structured risk program across their operation.
billed annually (A$7,200/yr)
- 10 power user seats
- Unlimited field users
- Unlimited sites
- 5,000 AI credits/month
- 5 GB file storage
- Bowtie diagrams & risk registers
- All assessment templates (HAZOP, HAZID, FMEA, SWIFT, WRAC)
- Incident reporting & investigation
- Hazard reporting
- Action tracking & close-out
- Lessons learned register
- QR code field reporting
- Email & in-app notifications
- Risk matrix & dashboards
- CSV & PDF export
- Custom roles and permissions
- Australian data residency
- Email support
Professional
For operations running critical risk processes, multi-site rollouts, and advanced controls.
billed annually (A$27,600/yr)
Additional power seats: A$55/mo each
- 40 power user seats included
- Unlimited field users
- Unlimited sites
- 15,000 AI credits/month
- 25 GB file storage
- Everything in Starter, plus:
- MUE Risk Assessments
- Injury management
- Workplace medical management
- Control testing & scheduling
- Risk maturity assessment
- Action SLA & escalation
- Risk appetite monitoring
- Advanced analytics
- Audit trail & version history
- Hierarchical taxonomy
- SSO on request (annual only)
- Priority support
Enterprise
For multi-site mining, oil & gas and construction groups with complex governance and security needs.
- Custom power user seat allocation (typically 75+)
- Unlimited field users
- Unlimited sites
- AI credits — sized to your usage
- Storage — sized to your needs
- Everything in Professional, plus:
- SSO / SAML
- Tailored deployment
- Dedicated success manager
- Custom contracts and DPA
- Enterprise support (SLA-backed)
All prices are in AUD and exclude GST. Starter, Professional and Enterprise plans include a 30-day free trial with demo data. No credit card required. Cancel anytime. Field users are unlimited on all plans except Entry (capped at 50).
Compare
Built different
See how RiskSight compares to the leading EHS and GRC platforms in the mining and heavy industry space.
| Capability |
RiskSight
| SafetyCulture | DoneSafe | Cority | SAI360 | INX / Quartex |
|---|---|---|---|---|---|---|
| Bowtie analysis (native) | Yes | No | No | Partial | Yes | No |
| Risk registers (ISO 31000) | Yes | No | Yes | Yes | Yes | Yes |
| Incident investigation (ICAM) | Yes | No | Yes | Yes | Yes | Yes |
| HAZOP / HAZID / FMEA templates | Yes | No | No | No | Partial | No |
| AI-powered risk insights | Yes | No | No | Yes | Partial | No |
| Critical Control Management (ICMM) | Yes | No | Yes | No | Yes | Partial |
| Critical Control Verification | Yes | Partial | Yes | Partial | Yes | Partial |
| Control effectiveness tracking | Yes | No | Yes | Yes | Yes | Partial |
| Action SLA & escalation | Yes | No | Yes | Yes | Yes | Yes |
| Self-serve setup (same day) | Yes | Yes | No | No | No | No |
Based on publicly available information as of June 2026. Cority bowtie analysis is available via partner integration (Salus Technical). SAI360 HAZOP is partial via PHA module. SafetyCulture CCV is limited to inspection checklists without structured CCM lifecycle. INX (now Quartex) supports critical control work via its risk register, inspections and corrective actions rather than a dedicated CCM/CCV lifecycle module. Contact vendors for latest capabilities.
FAQ
Common questions
Everything you need to know about RiskSight. Can't find the answer you're looking for? Contact our team.
Spreadsheets can't link risks to controls, track barrier effectiveness, or alert you when a control degrades. RiskSight connects your entire risk program — risks, controls, incidents, actions, assessments, and bowties — in a single integrated workflow. When something changes, the impact is visible immediately across your whole risk profile.
No. Once you're set up, you can explore the included demo data and start building your risk registers immediately — most teams are operational within a day. If you need help, our support team can assist with data migration and configuration — no six-month implementation required.
RiskSight includes pre-built templates for HAZOP, HAZID, FMEA, SWIFT, WRAC, and more. Each template includes a guided wizard that walks your team through the assessment process step by step. You can also create custom templates for your organisation's specific needs.
Yes. RiskSight's risk management framework is aligned with ISO 31000:2018. This includes risk identification, analysis, evaluation, and treatment workflows, with full audit trail and version history. Our risk registers support inherent and residual scoring with configurable likelihood and consequence matrices.
RiskSight provides interactive, drag-and-drop bowtie diagrams that connect threats through preventive and mitigative barriers to consequences. Each barrier links directly to your control register, so you can see real-time effectiveness and identify degraded barriers. No more static diagrams in PowerPoint.
Our AI analyses your risk data to suggest risk scores based on control effectiveness, detect similar risks across registers, identify control gaps, and generate risk descriptions. It's a decision-support tool — it helps your team work faster, not replace their judgement.
Power users create, manage, and approve — risk registers, bowtie diagrams, assessments, investigations, and reports. Field users report and observe — they log hazards, submit incidents, complete inspections, and record observations from any device. The Entry plan includes 3 power users and 50 field users. Starter and above include unlimited field users. You only pay for power users — field users are always free.
Critical Control Management (CCM) and Critical Control Verification (CCV) are included in Professional and Enterprise plans, along with injury management and workplace medical management. Entry and Starter include bowtie diagrams, risk registers, all assessment templates — HAZOP, HAZID, FMEA, SWIFT, and WRAC — plus incident and hazard reporting, action tracking, lessons learned, QR code field reporting, and notifications. That's the methodology foundation and the day-to-day workflow before you need formal CCM. When your regulator or insurer asks how you know your critical controls are working, that's the trigger to move to Professional.
Yes. Every plan includes a 30-day free trial with pre-loaded demo data — no credit card required, cancel anytime. Get in touch and we'll set your trial up so you can build your own registers, run assessments, and explore the full feature set before committing. No obligation.
RiskSight is built for high-hazard industries where operational risk is real — mining, construction, energy & utilities, manufacturing, and similar sectors. Our templates, terminology, and workflows are designed for safety professionals, risk managers, and site teams, not IT auditors.
All RiskSight data is hosted in Australia on every plan. We don't route your data through overseas servers. If your organisation has specific data sovereignty requirements, Australian residency is included as standard — no Enterprise contract required.
Yes. Custom roles and permissions are available on every plan, including Starter. You can define what each user can view, edit, and approve — across registers, sites, assessments, and reports — without needing to contact us or upgrade.
Start managing risk in
minutes, not months
Sign up and you'll start with demo data loaded, so you can see how your risk program should work. No credit card. No six-month implementation.
RiskSight